Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement.
MONGOLIAN MINING CORPORATION
(Incorporated in the Cayman Islands with limited liability)
(Stock Code: 975)
OPERATIONAL UPDATE
FOR THE QUARTER ENDED 31 MARCH 2026
HONG KONG, April 16, 2026 (GLOBE NEWSWIRE) — The board of directors (the “Board“) of Mongolian Mining Corporation (the “Company“, together with its subsidiaries, collectively the “Group“) wishes to announce the unaudited operational update for the quarter ended 31 March 2026. The comparative figures for the quarter ended 31 March 2025 and the quarter ended 31 December 2025 are also disclosed in this announcement (if and as applicable).
The Company is the largest internationally listed private mining company with operations focused on and located in Mongolia. The Group has consolidated a diversified business portfolio to develop and operate coking (metallurgical) coal, gold, silver, copper, and other non-ferrous metals mining assets in southern and western regions of Mongolia.
Coking (metallurgical) coal operations
The Group is the largest producer and exporter of washed coking coal products in Mongolia. Energy Resources LLC (“ER“), its wholly-owned subsidiary, operates the Ukhaa Khudag (“UHG“) coking coal mine, and Khangad Exploration LLC (“KEX“), the Group’s majority-owned subsidiary, operates the Baruun Naran (“BN“) coking coal mine, both located in Umnugobi aimag (province), Mongolia.
The main operational data for the Group’s coking (metallurgical) coal operations that comprising combined output delivered by ER from the UHG mine and by KEX from the BN mine for the quarter ended 31 March 2026 are summarised in Table 1 below.
Table 1. Main operational data for coking coal operations for the quarter ended 31 March 2026:
| The quarter | The quarter | Quarter-on-quarter | The quarter | Year-on-year | ||||
|
Item |
Unit |
ended 31 March 2026 |
ended 31 December 2025 |
(“QoQ”) change (%) |
ended 31 March 2025 |
(“YoY”) change (%) |
||
| ROM coal mined | kt | 4,846.0 | ||||||